Here are some photos of progress of our Vision Project

that we would like to share with you

Continuation of random photos of progress from 2022 that are not tied to any event. This gallery will be added to regularly.

(click on photos to enlarge and see any captions)

March 21, 2023
March 21, 20232
IMG_1237
March 20, 2023
March 20, 20231
March 20, 20233
March 9, 2023
230222 751_17172.JBB Western UP Shooting Complex DTMB-0456 (Project Report) 16
230222 751_17172.JBB Western UP Shooting Complex DTMB-0456 (Project Report) 16
cabinet
IMG_1223
IMG_1222
IMG_1228

Photos taken by our Club President Walt Toepfer while on a site visit today, 09-07-2022

(click on photos to enlarge and see any captions)

Continuation of random photos of progress from 2022 that are not tied to any event. This gallery will be added to regularly.

(click on photos to enlarge and see any captions)

09_01_22_pg4

Some photographs taken by Club President while attending

a site inspection on 8-24-2022

(click on photos to enlarge and see any captions)

Some random photos of progress from 2022 that are not tied to any event. This gallery will be added to regularly.

(click on photos to enlarge and see any captions)

2
g4

Some photos taken 5-23-2022 after work hours

Our “Vision” project was officially approved by the State of Michigan on 12Apr22.

The construction contract was awarded to Moyle Construction on 20Apr22

 

The pre-construction meeting was held at 10:00 AM on Fri, 6May, at the LSSC facilities. 

 

Present were representatives from LSSC, the State, the state’s prime design contractor, NFE, and OHM, a sub-contractor to NFE, and the construction contractor, Moyle Construction.  The weather was great and the meeting was held outside rather than in the archery room as planned.

 

After the pre-con meeting, about 11:00 AM, a ground breaking ceremony was held at the new construction site.  Many of the same persons attended.

Below are some photos of the pre-construction meeting and the groundbreaking.

- Click photo to enlarge.

Some necessary soil boring was done on 10-30-2019

Some preliminary site clearing was done on 8-26-2019